1200字范文,内容丰富有趣,写作的好帮手!
1200字范文 > 控制要点 control points英语短句 例句大全

控制要点 control points英语短句 例句大全

时间:2024-01-20 22:22:43

相关推荐

控制要点 control points英语短句 例句大全

控制要点,control points

1)control points控制要点

1.Constructingcontrol points of epoxy bitumen concrete steel bridge pavement;环氧沥青混凝土钢桥面铺装的施工控制要点

2.Oncontrol points of labs for supervision centers in tunnel construction隧道施工中监理中心试验室控制要点

3.Discussion on supervisioncontrol points of deep foundation earth excavation浅谈深基坑土方开挖监理控制要点

英文短句/例句

1.The Heat Preservation of the Outside Wall for Stiokon Polystyrene Board s Executve Controlled Essentials;外墙外保温粘贴聚苯板施工控制要点

2.On the Operating Errors of CIS in the Hotel Enterprises and Its Controlling Gists;论饭店企业CIS的导入误区与控制要点

3.Analysis of Key Points of Supervision Quality Control in Safety Monitoring Item浅议安全监测项目监理质量控制要点

4.Key Points of Quality Control of Vacuum Freeze Drier冷冻真空干燥机的质量技术控制要点

5.QUALITY CONTROL REQUIRMENTS OF HOT ROLLING PROCESS FOR HRBF500HRBF500螺纹直条的质量控制要点

6.On construction process of bridge expansion joint and its quality control points桥梁伸缩缝施工过程及质量控制要点

7.Analysis on key points for cracks" control of mass concrete大体积混凝土浇筑裂缝控制要点浅析

8.Inquiry of Highway Micro-surfacing Construction and Quality Control Points公路微表处施工及质量控制要点探究

9.On control points of labs for supervision centers in tunnel construction隧道施工中监理中心试验室控制要点

10.Essentials and Basis for Control of Electromechanical Engineering for Quality on the Freeway高速公路机电工程质量控制要点分析

11.Simple Talking about Construction Technology for T-type Beam of 30m浅谈30mT梁施工工艺及质量控制要点

12.On Construction Quality and Its Controlling Points of Urban Road Subgrade市政道路路基施工质量及其控制要点

13.Quality Control Gist of Roadbed Earthwork of Road Work at Embankment Top堤顶道路工程路基土方质量控制要点

14.On the control points of the post-tensioned prestressed hollowslab beam后张法预应力空心板梁施工控制要点

15.Essentials of Control of Spatial Form Scaffolding试论高大模板支撑工程施工控制要点

16.Frequently Asked Questions and the key points of the Boilers" Installation锅炉安装常见问题及其质量控制要点

17.Engineering Practice and Quality Control Cruces of PHC Pipe PilePHC管桩工程实践及质量控制要点

18.Problem analysis of basement waterproofing and preliminary study on control points地下室防水问题剖析与控制要点初探

相关短句/例句

control point控制要点

1.Conclusion oncontrol points of the loess tunnel construction黄土隧道施工控制要点总结

2.This article introduced the cooling treatment process andcontrol point for overhaul to two coking ovens of 66-III type.介绍了 6 6 -III型焦炉降温大修的经过和控制要点以及大修的效果。

3.On the basis of the practical project,author introduces the construction and supervisioncontrol points of EPDM in underground waterproof engineering,which contribute to ensure the quilt of the underground waterproof engineering.结合工程实例,介绍三元乙丙橡胶防水卷材在地下防水工程中的施工及监理控制要点,为确保地下防水工程质量创造条件。

3)controlling points控制要点

1.New thought andcontrolling points in project quality supervision;工程质量监督新思考与控制要点

4)control key控制要点

1.Processcontrol key in the Φ10mm bar three-slitting rolling;φ10mm带肋钢筋三切分轧制工艺的控制要点

2.The paper introduces the application of high-performance concrete in the paving of bridge beam and joint device, such as steel fibre concrete or polymer fibre concrete, the mixture ratio design, main construction technique andcontrol keys.介绍钢纤维混凝土或聚合物纤维混凝土等高性能混凝土在桥梁铺装及伸缩装置上的使用 ,配合比设计和主要施工工艺以及施工控制要

5)control essentials控制要点

1.This paper states severalcontrol essentials of how to assure the inner quality of principal project.文章对如何保证主体工程内在质量的几个控制要点进行了论述。

6)controlling essentials控制要点

1.The paper introduces the practical use of vacuum mortar method in the construction of NE directional ramp bridge by analyzing the main steps andcontrolling essentials of this method.1标淮河路NE定向匝道桥预应力真空吸浆法应用,介绍预应力管道真空吸浆法的施工方法及控制要点。

延伸阅读

预涂膜覆膜工艺的控制要点及注意事项覆膜前的准备工作(1)用于覆膜的BOPP薄膜的厚度一般应在0.01—0.02mm之间,透明度应在90%以上,且热收缩率要小。(2)上机前,应检查日oPP薄膜是否在保质期内,薄膜上的涂胶层是否均匀,表面是否被划伤,压伤。薄膜的涂胶面要穿过加热滚筒并面向印刷品。(3)橡胶辊和加热滚筒一定要保持洁净,两边的压力平衡辊必须转动灵活。(4)根据纸张厚度调节和确定输纸辊的间隙。(5)根据产品尺寸选择不同宽度的BOPP薄膜,同时应根据产品的要求调节好侧规。(6)调节好导膜辊,使薄膜两边的张力一致,薄膜的表面孚展无皱褶。预涂膜覆膜工艺控制要点预涂膜覆膜工艺的关键技术主要是对覆膜温度、覆膜压力和覆膜速度的控制等几个方面。1.覆膜温度温度是预涂膜覆膜的首要因素,因为预涂膜上的黏合剂是热熔胶,温度决定了热熔胶的熔融状态,决定了热熔胶分子向BOPP薄膜、印刷品墨层、纸张等的渗透能力和扩散能力。尽管覆膜温度的提高有助于黏合强度的增强,但温度过高会使薄膜产生收缩,产品表面发亮、起泡,产品产生皱褶。根据实践经验,覆膜温度应控制在70~100℃之间。2. 覆膜压力纸张的表面并不平整,只有在适宜的压力下,熔融状态的热熔胶才能完全覆盖印刷品表面,覆膜产品才光亮,黏结效果好。压力小,黏结不牢;压力大一些,有助于提高薄膜和纸制品间的结合力。但是,如果压力过大,又容易使产品产生皱褶,而且容易使橡胶辊表面受伤。变形,降低橡胶辊的使用寿命。随着压力的增大,使橡胶辊和加热滚筒间的接触压力增大,使两辊的轴头、轴承负荷加重,磨损加剧,同时使传动系统的负荷加重,因而压力太大会影响整机的使用寿命。 在实际生产中,应当根据纸张的不同来调节压力。比如对于纸质疏松的纸张,压力要大一些,反之则小一些。根据经验,覆膜压力一般设定为8~25MPa为宜。3.覆膜速度覆膜速度的快慢决定了预涂膜上的黏合剂在加热滚筒上的熔化时间以及薄膜和纸张的接触时间。覆膜速度慢,BOPP薄膜上黏合剂的受热时间相对较长,薄膜和纸张的压合时间长,黏结效果好,但生产效率低。覆膜速度快,BOPP薄膜上的黏合剂在加热滚筒上的受热时间短,薄膜和纸张的接触时间短,黏合效果差。国产预涂膜覆膜设备的生产速度一般控制在5—30m/min之间。以上对预涂膜覆膜中的三大关键工艺技术——覆膜温度、覆膜压力和覆膜速度做了简单分析,但三者之间的调节配合应根据所使用设备的不同、覆膜产品种类的不同以及所使用薄膜种类的不同等实际情况,灵活掌握,只有这样才能得到高质量的覆膜产品。

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。