1200字范文,内容丰富有趣,写作的好帮手!
1200字范文 > 立井施工速度 mine shaft construction speed英语短句 例句大全

立井施工速度 mine shaft construction speed英语短句 例句大全

时间:2020-03-11 01:35:04

相关推荐

立井施工速度 mine shaft construction speed英语短句 例句大全

立井施工速度,mine shaft construction speed

1)mine shaft construction speed立井施工速度

1.In order to improve the cut blasting rate of mine shaft deep borehole, to reduce the blasting material consumption and the circu- lated blasting operation time and to speed up themine shaft construction speed, an applied study on the cut borehole diameter, depth, section number and initiating time difference and other parameters was conducted for the cut of two-section and three-section.为了提高立井深孔掏槽爆破效率,减少爆破器材消耗量和循环钻爆作业时间,加快立井施工速度。

2)vertical shaft construction立井施工

1.This paper introduces the technology and application of synchronous concentrated control of several steady vehicles invertical shaft construction, which has solved the dissynchromous consentrated control problem of steady vehicles and achieved great effect invertical shaft construction.本文介绍了立井施工中多台稳车同步集中控制技术及其应用,解决了稳车不能同步集中控制的问题,在立井井筒施工方面取得了良好的效果。

2.Taking thevertical shaft construction of Qianfogou Coal Mine as the example, this paper introduces in detail the technology of slide template, and puts forward some matters needing attention in the construction.以千佛沟矿排矸立井施工为例,详细介绍了滑动模板筑壁的工艺,提出了施工中的注意事项。

英文短句/例句

1.Desigh of Centralized Control System of Sinking Hoist in Shaft Construction立井施工凿井绞车集中控制系统设计

2.This paper in detail presented the transition of shaft sinking equipment for drift excavation in Wangershan Gold Mine.介绍了在山东省望儿山金矿立井施工中,利用立井凿井设施进行平巷施工的改装方法。

3.Water Inrush Prevention in Vertical Shaft Construction under Special Water Bearing Condition特殊赋水条件下立井施工防治水技术

4.Experience on the shrink shaft drilling construction reserve period缩短立井井筒凿井施工准备期的经验

5.Rapid Construction Methods of Welling 148m Monthly in Vertical Shaft in Dongtong东同立井月成井148m快速施工方法

6.Discussion on Working Platform Arrangement Pattern in Vertical Shaft Construction立井井筒装备施工吊盘布置方式探讨

7.Vertical Shaft Aquifer Surface Advance Grouting Engineering Technique立井井筒含水层地面预注浆施工技术

8.The ConstructionAnalysis of Anti-Well Method Through Falling Soft Rock Section反井法施工立井井筒过软岩垮落段实践分析

9.Raise construction for vertical coal bunker:technical practice in shaft wall water leakage prevention and control立井煤仓反井施工及井壁防渗漏水技术的实践

10.New Ideas and Construction Practice Concerning Air Shaft Material in the Compressible Layer立井井筒可缩层选材的新思路与施工实践

11.Increasing Blasting Efficiency of Frozen Rock and Speedingup Shaft Construction提高冻结基岩爆破效率 加快立井井筒施工速度

12.The Simple Discussion on the Safe Construction of Deep Thick Swelling Clay Layer of Vertical Shaft浅谈立井井筒深厚冻结膨胀粘土层的安全施工

13.Discussion on full face pull construction technology of the deep mine shaft drilling method深立井钻井法全断面一次钻进施工技术的探讨

14.On Construction Technology of Shaft Steel Frame of Wangfenggang Shaft in No.1 Xiejiaji Coal Mine谢一矿望峰岗主井钢结构立井套架的施工技术

15.Quick Construction Technology of Big Section Deep Shaft with Freezing Surface Soil大断面深立井井筒冻结表土段快速施工技术

16.Construction Practice on Rapid Driving through Silt Layer in Large-bore Vertical Shaft大断面立井井筒快速通过砂土层的施工实践

17.New construction technology of setting large steel-structure shaft frame during shaft sinking凿井期间起立大型钢结构井架施工新技术

18.The Construction Technology of the Frozen Air Shaft with Huge-Thick Soil and Major Diameter巨厚表土层大直径立井井筒冻结法施工技术

相关短句/例句

vertical shaft construction立井施工

1.This paper introduces the technology and application of synchronous concentrated control of several steady vehicles invertical shaft construction, which has solved the dissynchromous consentrated control problem of steady vehicles and achieved great effect invertical shaft construction.本文介绍了立井施工中多台稳车同步集中控制技术及其应用,解决了稳车不能同步集中控制的问题,在立井井筒施工方面取得了良好的效果。

2.Taking thevertical shaft construction of Qianfogou Coal Mine as the example, this paper introduces in detail the technology of slide template, and puts forward some matters needing attention in the construction.以千佛沟矿排矸立井施工为例,详细介绍了滑动模板筑壁的工艺,提出了施工中的注意事项。

3)shaft construction立井施工

1.This article illustrates the critical role of mechanical-electro management from the sides of new technology, smart equipment and management inshaft construction.从使用新工艺、新设备 ,加强设备的维护管理等方面说明了机电管理在煤矿立井施工中的举足轻重作用 ,具有较大的指导作

2.The risk ofshaft construction is analyzed by using safety system engineering method.本文以安全系统工程的方法分析立井施工中的风险,对危险源进行辩识和评价,找出立井施工期间安全控制的原则及所依据的理论,可为立井施工的安全管理提供参考。

3.This paper introduces three methods in vehicle control during theshaft construction,and points out the usage and shortcomings of electronic control system consisting of a single,centralized control with multiple relays,buttons and other conventional electrical components.本文介绍了立井施工中稳车控制的3种方法,指出了单台、多台集控以继电器、按钮等常规电器元件构成的电控系统在现场实践中的使用和其缺陷。

4)deep standing well construction深立井施工

1.The paper introduces applied content and result in order to offer reference todeep standing well construction during drainage.淄博矿业集团济北矿区唐口矿风井井筒深度1044m,在选择施工期间排水方案时,为了克服吊泵事故率高、维修不方便、投资大等缺点,改为吊盘上安装卧泵排水,取得了比较理想的效果,主要介绍了方案确定、具体实施内容及效果,可供处理大涌水量的深立井施工期间排水参考。

5)construction speed施工速度

bined with practical work the characteristics,technological principle,assembly of raise scaffold andconstruction speed of rail mounted electric-controlled integral climbing scaffold are introduced.结合工程实例,对导轨式电动整体提升爬模的方案特点、工艺原理、爬架组装工艺设计要点及施工速度进行了介绍,并对该施工方案进行了技术经济分析,最后对钢制大模板的应用进行了阐述,以推广新技术的广泛应用。

6)vertical shaft inner wall construction立井内壁施工

延伸阅读

施工企业技术组织措施计划(见施工企业技术)施工企业技术组织措施计划(见施工企业技术)technical and organize measurement plan in construction enterprise施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。